Didara oke ti o gbẹkẹle ati iduro kirẹditi kirẹditi nla jẹ awọn ipilẹ wa, eyiti yoo ṣe iranlọwọ fun wa ni ipo ipo giga. Adhering fun awọn tenet ti "didara akọkọ, onibara adajọ" fun Hot Tita fun China Ss450 s460 s500 s550 s690 s890 s960 igbekale awo irin.
A fi itara gba ọ lati ṣe agbekalẹ ifowosowopo ati ṣẹda ọjọ iwaju didan papọ pẹlu wa.
Tita gbigbona fun China Irin Pipe, Irin Tube, A ni bayi ti a ti ṣe igbẹhin ati ẹgbẹ tita ibinu, ati ọpọlọpọ awọn ẹka, ṣiṣe ounjẹ si awọn onibara akọkọ wa. A ti n wa awọn ajọṣepọ iṣowo igba pipẹ, ati rii daju pe awọn olupese wa yoo ni anfani nitõtọ ni kukuru ati igba pipẹ.
Standard | AiSi, ASTM, bs, DIN, GB, JIS |
Ipele | Awọn onibara ìbéèrè |
Ibi ti Oti | Shandong, China |
Oruko oja | Awọn onibara ìbéèrè |
Nọmba awoṣe | Awọn onibara ìbéèrè |
Iru | Dogba |
Ohun elo | Awọn onibara ìbéèrè |
Ifarada | ± 1% |
Iṣẹ ṣiṣe | Lilọ, Welding, Punching, Decoiling, Gige |
Orukọ ọja | Irin Igun Pẹpẹ |
Ilana | Gbona Yiyi Tutu Yiyi |
Dada itọju | Onibara ká ibeere |
Package | Standard Òkun-yẹ Iṣakojọpọ |
Apẹrẹ | Equilateral Angle Bar |
Ijẹrisi | ISO |
MOQ | 1 Toonu |
Isanwo | T/T 30%+70% |
Brand | Liange |
Nkan | Awọn ohun elo Ikọlẹ |
Orukọ ọja |
igi igun irin |
Ohun elo |
200Series/300Series/400Series |
Iru ọja |
201/202/301/302/303/303Se/304/304L/304N/XM21/305/309S/310S/316/316Ti S31635/316L/316N/316LN/317/373/317M / 403/405/410/420/430/431 |
Standard |
ASTM DIN GB ISO JIS BA ANSI |
Dada itọju |
Ti a ṣe, Dudu, Didan, Digi A/B, Alailowaya, Fifọ Acid, Awọ Varnish |
Imọ-ẹrọ |
tutu kale, tutu ti yiyi, gbona ti yiyi. |
DIN |
Awọn onibara ìbéèrè |
Gigun |
5.5m / 5.8m / 6m / 9m / 12m |
MOQ |
5tons |
Iṣakojọpọ okeere |
irin igun bar aba ti. |
Awọn ofin ti sisan |
30% T / T ati 70% iwontunwonsi |
Akoko Ifijiṣẹ |
Awọn ọjọ 7-10 lẹhin gbigba idogo naa. |
Awọn ofin ti owo |
FOB, CIF, CFR, EXW. |
Ibudo
Tianjin Port
<<<Picture Example
Lead Time:
Quantity(Tons) |
1 - 25 |
>25 |
Est. Time(days) |
10 |
To be negotiated |
1. Free sample can be supplied
2. Trial order is acceptable
3. Third party test is acceptable
4. Delivery time guarantee
--1. Q: What is your MOQ(minimum order quantity)?
A: Only One Piece
--2. Q: What is your packing methods?
A: Packed in bundle or bundle with plastic bag or bulk.
--3. Q: What is your payment terms?
A: T/T 30% in advance by T/T, 70% will be before shipment under FOB.
T/T 30% in advance by T/T, 70% against the copy of BL under CIF.
T/T 30% in advance by T/T, 70% LC at sight under CIF.
100% LC at sight CIF.
--4. Q: What is your delivery time?
A: Usually 15-20 days after received the advance payment, also depends on quantity.
--5. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
1. 2015 Kuwait airport construction
2.2017 Singapore tunnel project construction
3. Curtain wall project of Hong Kong Government in 2010
4.2020 London GRG project construction
5. Steel structure construction project of Liaocheng Cultural Square
6. Liaocheng gymnasium construction project
7. 5g signal tower in 2020
8. Steel structure construction in Singapore in 2020